Fire systems for
hazardous areas.
A treatment works still needs fire detection, alarms and emergency lighting. In the parts of it classified as hazardous zones, every device has to be the right kind, fitted the right way, by somebody assessed as competent to do it. Gemini AMPM installs, inspects and maintains fire and life-safety systems in zoned areas at water industry sites with a CompEx certificated engineer holding units Ex09 and Ex10.
An ordinary fitting
can be the spark.
Wastewater treatment produces methane and other flammable gases as a matter of course. Wet wells, pumping stations, sludge handling and digestion plant can all hold an explosive atmosphere, so the site operator classifies those places into zones under the Dangerous Substances and Explosive Atmospheres Regulations 2002 (DSEAR): Zone 0 where the atmosphere is present continuously or for long periods, Zone 1 where it is likely in normal operation, Zone 2 where it is unlikely and short-lived.
Inside a zone, a standard detector, call point, sounder or luminaire is a possible source of ignition. Equipment has to be explosion-protected (Ex) and certified for the zone, the gas group and the temperature class. It has to be selected and installed to BS EN 60079-14, and inspected and maintained to BS EN 60079-17. A flameproof enclosure with one wrong cable gland, or an intrinsically safe circuit with the wrong barrier, is no longer protected, and nothing about it will look wrong from a distance.
Scoped, delivered,
evidenced.
- Surveys of fire and life-safety equipment in zoned areas
- Ex-rated detectors, call points, sounders and beacons
- Ex-rated emergency lighting
- Installation to BS EN 60079-14
- Inspection and maintenance to BS EN 60079-17
- Ex equipment registers and inspection records
- BS 5839-1 design and certification for the whole site
- Planned maintenance with a named engineer
The competence belongs
to the engineer.
CompEx is the certification scheme for people who work on equipment in explosive atmospheres. It certifies the individual, not the company, by written examination and practical assessment, and CompEx Certification is accredited by UKAS to ISO/IEC 17024. A certificate lasts five years and then has to be earned again.
Two units are written for the water industry. Ex09 covers the preparation and installation of electrical equipment in explosive atmospheres within the water industry. Ex10 covers its inspection, test and maintenance. Our engineer holds both, awarded in November 2026 after sixteen years with Gemini working on fire and life-safety systems. The certificate can be verified with CompEx, and we will send it with any quotation that includes zoned areas. The story behind it is in our news.
One contractor for the
whole site, zones included.
We work to your hazardous area classification drawings and your permit system. In the zoned areas that means surveying what is installed against the zone it sits in, installing Ex-rated detection, manual call points, sounders, beacons and emergency luminaires with the correct glands, barriers and earthing, and carrying out the visual, close and detailed inspections BS EN 60079-17 describes. Every Ex device goes on an equipment register with its certificate details, so the next inspection starts from a record and not from a ladder.
Outside the zones the system is designed, installed and maintained as any other: fire detection and alarm to BS 5839-1 under our BAFE SP203-1 registration, emergency lighting to BS 5266-1, and planned maintenance with a named engineer. The point of doing both is that the site ends up with one system, one set of records and one phone number, instead of a fire contractor who stops at the zone boundary and a hazardous area specialist who does not know the fire standard.
Water industry sites.
We will say so if it is not.
CompEx units are specific. Ex09 and Ex10 cover electrical equipment in explosive atmospheres within the water industry: water and wastewater treatment works, pumping stations and sludge plant. They are not the units for fuel filling stations, and they are not the general gas and vapour units used across oil, gas and chemical sites.
If your site is outside the water industry, ask us anyway. We will tell you plainly whether the work falls inside what our engineer is certificated for, and if it does not, we will say so before anyone prices anything. Area classification itself stays with you: deciding where the zones are is part of the site operator’s DSEAR risk assessment, and we work to it.
Common questions on
hazardous area fire systems (compex).
What is CompEx?
CompEx, short for Competency in Explosive Atmospheres, is the recognised scheme for certifying people who install, inspect and maintain equipment in hazardous areas. Candidates sit written exams and practical assessments. CompEx Certification is accredited by UKAS to ISO/IEC 17024, and a certificate is valid for five years.
Is CompEx a legal requirement?
No regulation names CompEx. DSEAR and the Electricity at Work Regulations 1989 require work on equipment in explosive atmospheres to be done by people who are competent to do it, and CompEx is the most widely recognised way to demonstrate that competence. Site operators commonly make it a condition of working in a zoned area.
Which CompEx units does your engineer hold?
Ex09 and Ex10, the two units for the water industry. Ex09 is preparation and installation of electrical equipment in explosive atmospheres. Ex10 is inspection, test and maintenance. Both were awarded in November 2026 and run to November 2031.
Can we check the certificate?
Yes. CompEx certificates can be verified with CompEx, and we supply a copy with any quotation or pre-qualification that involves zoned areas.
Do you classify the zones for us?
No. Hazardous area classification is part of the site operator’s DSEAR risk assessment. We work to your classification drawings and equipment schedules, and we will flag anything we find on site that does not match them.
Do you cover hazardous areas outside the water industry?
Our CompEx units are the water industry units. For other sites, such as fuel, chemical or dust-hazard premises, tell us what you have and we will say plainly whether it falls inside our certificated scope before anything is priced.
Tell us about
the building.
A named engineer comes back within 24 hours, not a call centre. Site surveys are free for commercial premises, no obligation.
Related insights.
Talk to us about
hazardous area fire systems (compex).