Fire, security & ventilation
for Residential & Social Housing.
Social housing fire safety is the post-Grenfell sector where the regulatory bar has moved the furthest. Awaab’s Law, the Building Safety Act and the Fire Safety Act 2021 have made the Responsible Person’s duties more granular, more time-bound, and more enforceable. We work across the residential and social housing portfolio, from low-rise estates to higher-risk buildings, with named clients including FirstPort, Newlon Housing, Moat Homes and the Royal Borough of Kensington & Chelsea.
Service lines for residential & social housing.
Fire Systems
Fire alarms and evacuation, AOV smoke extract, disabled refuge and PAVA. Designed, installed and maintained to current British standards, with monitored response when the alarm actually sounds.
Passive Fire Systems
Fire doors, fire stopping, compartmentation, barriers and risk assessments: the protection that works without anyone pressing a button.
Security & Access Control
Intruder alarms, CCTV, access control, door entry and 24/7 monitoring: the systems that stay awake after the last person leaves.
Ventilation & Air Quality
AHU and ductwork install, service and repair, fire-damper testing, TR/19 hygiene, kitchen extract, AOV smoke extract, cleanrooms and water hygiene.
Where the compliance
pressure is.
Building Safety Act 2022 golden-thread obligations · Awaab’s Law response-time duties · BS 5839-1:2025 fire detection · BS 8629 evacuation alert systems · Homes England Interim Measures Alarm Fund (IMAF) eligibility.
The regulations
that shape the work.
- Regulatory Reform (Fire Safety) Order 2005
- Fire Safety Act 2021
- Building Safety Act 2022
- Awaab’s Law
- BS 5839-1 (fire detection)
- BS 8629 (evacuation alert)
- PAS 79-2 (FRA methodology for housing)
Every install is delivered to the relevant British / European standard with an audit-ready evidence pack at handover.
Related insights.

Awaab’s Law and fire safety: what social housing landlords need to know in 2026
Fire hazards join Awaab’s Law on 30 November 2026. What social landlords need in place before the deadline, and the response clocks that follow.

Awaab’s Law phase 2: fire and electrical hazards on the clock from 30 November
From 30 November 2026 Awaab’s Law covers fire and electrical hazards, with response clocks of 24 hours to 12 weeks that tenants can enforce.

Cladding fund for under 11m buildings opens 17 August
The under 11 metres cladding fund opens 17 August 2026 for eight weeks. You cannot apply without a FRAEW, and the queue is decided by timestamp.