From the
control room.
Standards change, regulations tighten, and buildings get more complex. We write about what that means in practice: fire, security, ventilation and compliance, explained by the people doing the work.
London False Alarm Index: 47,038 false alarms in 2025
Our analysis of London Fire Brigade’s open data: 47,038 automatic fire alarm false alarms in 2025, ranked by borough, with the effect of the 2024 policy.
geminiampm.co.uk/london-false-alarm-index/PSTN switch-off 2027: what in your building still dials out?
The analogue phone network closes on 31 January 2027. How to find the alarm diallers, door entry panels and lift phones still using it, and what to do.
geminiampm.co.uk/pstn-switch-off-fire-alarms-door-entry/FIA ASD Code of Practice 2026: what it means if you have one
The FIA’s first rewrite of its aspirating smoke detection code since 2012. What changes for warehouses, data centres and suppression, and what to check.
geminiampm.co.uk/fia-asd-code-of-practice-2026/Gateway 2 timescales: how long fire safety works really take
BSR data shows internal works in higher-risk buildings take a median 32 weeks to approve and one in five are rejected. What that means for your programme.
geminiampm.co.uk/gateway-2-timescales-fire-safety-works/Approved Document B: what changed on 30 September 2026
The 2026 amendments to Approved Document B took effect on 30 September. Second stairs, evacuation shafts, smoke control and the transitional rules.
geminiampm.co.uk/approved-document-b-30-september-2026/PAS 9980:2026: what changes for your external wall appraisal
The revised PAS 9980 for external wall appraisals is out. Your 2022 FRAEW stays valid. What changes for new appraisals, funding and interim alarms.
geminiampm.co.uk/pas-9980-2026-fraew-what-changes/Choosing a fire risk assessor in 2026: BS 8674 explained
New regulated qualifications for fire risk assessors launched in September. What BS 8674 levels mean, and six checks before you appoint anyone to assess.
geminiampm.co.uk/choosing-a-fire-risk-assessor-bs-8674/Rooftop solar fire risk: what your fire risk assessment has never seen
Commercial solar fires rose 46% in a year and industrial fires more than doubled. DC cabling is the leading cause. What to check on your roof, and when.
geminiampm.co.uk/rooftop-solar-pv-fire-risk-commercial/Missing cavity barriers: the defect no drawing shows
A £3.4m High Court claim turns on defects hidden behind cladding and above ceilings. Why as-built compartmentation has to be surveyed, not assumed.
geminiampm.co.uk/cavity-barriers-hidden-defects-survey/Prohibition notices up 27%: what the 2026 fire safety enforcement figures actually say
New MHCLG figures: 1,224 prohibition notices in a year, up 27%, while prosecutions fell to 33. What each notice does, and why the 21 day appeal matters.
geminiampm.co.uk/fire-safety-enforcement-statistics-2026/AOV smoke ventilation systems explained: what they are, where the rules expect them, and how they work
What an AOV is, where Approved Document B expects one, natural versus mechanical smoke control, and why a vent that opens on test can fail in a fire.
geminiampm.co.uk/aov-smoke-ventilation-systems-explained/Fire door rules did not change in 2026. Three other things did.
No new fire door maintenance law arrived in 2026. The checking duty dates from January 2023. What did change: BS 8214, inspector competence and BS 476.
geminiampm.co.uk/fire-door-rules-2026-what-actually-changed/How often does a gas suppression system need servicing?
Two engineer visits a year for most systems. What BS EN 15004 actually expects, what gets checked at each visit, and what happens after a discharge.
geminiampm.co.uk/gas-suppression-servicing-intervals/Flats above shops: the fire safety failures Sussex keeps prosecuting
Three Sussex prosecutions, one building type: flats over commercial units. What fire officers found in each case, and what to check in your own block.
geminiampm.co.uk/flats-above-shops-fire-safety-sussex/Smoke vent testing: what the law actually requires, and how often
AOVs and smoke vents are life safety equipment with legal testing duties attached. Who must test them, how often, and what the record has to show.
geminiampm.co.uk/smoke-vent-aov-testing-requirements/Shopping centre security regulations in the UK: what actually applies in 2026
No single law governs shopping centre security. Four regimes do: fire law, Martyn’s Law, data protection for CCTV and alarm response standards.
geminiampm.co.uk/shopping-centre-security-regulations-uk/Gemini AMPM awarded BAFE SP203-4 emergency lighting certification
Gemini AMPM is now BAFE SP203-4 registered for emergency lighting systems: a fourth scheme registration under Registered Organisation ID 302260.
geminiampm.co.uk/bafe-sp203-4-emergency-lighting-certification/Does your access control release in a fire? The BS 7273-4 questions every building owner should ask
Access control and fire alarms are usually maintained by different contractors, and the interface is where compliance dies quietly. Five questions to ask.
geminiampm.co.uk/access-control-fire-alarm-release/Gemini AMPM approved for the Homes England IMAF supplier panel
Gemini AMPM is an approved Homes England Interim Measures Alarm Fund supplier panel member, the scheme replacing waking watch costs. Confirmed August 2026.
geminiampm.co.uk/homes-england-imaf-supplier-panel-application/Cladding fund for under 11m buildings opens 17 August
The under 11 metres cladding fund opens 17 August 2026 for eight weeks. You cannot apply without a FRAEW, and the queue is decided by timestamp.
geminiampm.co.uk/cladding-fund-under-11-metres/Two-thirds of building safety certificates refused
The BSR has paused new building assessment certificate call-ins after refusing 66% this year. Why they fail, and the evidence your building needs.
geminiampm.co.uk/building-assessment-certificate-reset/Nine fire alarm faults, no risk assessment, £33,700 to pay
A Somerset guest house was ordered to pay £33,700 after inspectors found nine fire alarm faults and no risk assessment. What to check in your building.
geminiampm.co.uk/fire-alarm-faults-prosecution/Fire alarm maintenance contracts: what BS 5839-1 requires and what a good contract includes
What BS 5839-1:2025 requires of a fire alarm maintenance contract, what a proper service visit covers, and the red flags in a cheap quote.
geminiampm.co.uk/fire-alarm-maintenance-contracts-bs-5839-1-guide/Wireless fire alarm systems vs wired: the real cost comparison for commercial buildings
Wireless devices cost more, wireless installations often cost less, and neither number decides it. Where the money really goes, and where wired still wins.
geminiampm.co.uk/wireless-vs-wired-fire-alarm-cost/Fire alarm monitoring options compared: ARC signalling, keyholder response and app-based alerts
The Redcare era is over. Keyholder response, app alerts and ARC monitoring compared: who watches, who calls the fire service, what insurers accept.
geminiampm.co.uk/fire-alarm-monitoring-options-compared/Inert gas vs chemical agent fire suppression: which does your risk need?
Both are clean agents and both put the fire out, but they are very different to own. Floor space, discharge, room integrity, refills and PFAS compared.
geminiampm.co.uk/inert-gas-vs-chemical-agent-suppression/TR19 Air and the Vent Hygiene Register: what building owners actually have to evidence
TR19 split into Grease and Air, and VHR Air arrived in March 2026. What each covers, how often systems need cleaning, and the evidence insurers expect.
geminiampm.co.uk/tr19-air-vent-hygiene-register-explained/BAFE SP203-1 vs SP207: which certification matters for your fire system project
SP203-1 covers fire detection to BS 5839-1; SP207 covers evacuation alert to BS 8629. Who needs which, and how to check a contractor’s real scope.
geminiampm.co.uk/bafe-sp203-1-vs-sp207-explained/The Fire Safety Order enforcement guidance just changed: what responsible persons need to know
MHCLG updated its Fire Safety Order enforcement guidance on 3 July 2026, adding a formal route for technical disputes. It runs entirely on documentation.
geminiampm.co.uk/fire-safety-order-enforcement-guidance-2026/Martyn’s Law begins: June 2026 commencement starts the countdown to spring 2027
Martyn’s Law: the first provisions of the 2025 Act took effect on 15 June 2026. What standard and enhanced tier premises must have ready.
geminiampm.co.uk/martyns-law-june-2026-commencement/Awaab’s Law phase 2: fire and electrical hazards on the clock from 30 November
From 30 November 2026 Awaab’s Law covers fire and electrical hazards, with response clocks of 24 hours to 12 weeks that tenants can enforce.
geminiampm.co.uk/awaabs-law-phase-2-fire-hazards/PFAS and clean agent suppression: what data centre operators should do in 2026
3M has left the PFAS business and UK REACH is moving on firefighting foams. What owners of FK-5-1-12 and FM-200 suppression systems should actually do now.
geminiampm.co.uk/pfas-clean-agent-suppression-2026/Fire risk assessments: what the law actually requires, and a free second-opinion review service
Every non-domestic building in England needs a current fire risk assessment. Send us yours for a plain English second opinion and prioritised actions.
geminiampm.co.uk/fire-risk-assessment-review-service/Wireless fire alarm systems: when wireless beats wired (and when it doesn’t)
Wireless fire alarm systems have caught up with wired on reliability and certification. Here’s when wireless is the right choice.
geminiampm.co.uk/wireless-fire-alarm-systems-when-to-choose/Gas suppression vs sprinklers for data centres: which protects what
Inert gas, chemical agent, or sprinklers: a clear comparison framework for IT and mission-critical environments.
geminiampm.co.uk/gas-suppression-vs-sprinklers-data-centres/Awaab’s Law and fire safety: what social housing landlords need to know in 2026
Fire hazards join Awaab’s Law on 30 November 2026. What social landlords need in place before the deadline, and the response clocks that follow.
geminiampm.co.uk/awaabs-law-fire-safety-2026/Flagship success at Peterborough Court
Gemini AMPM delivers a landmark fire, gas suppression and security project in the City of London.
geminiampm.co.uk/flagship-success-at-peterborough-court/Our transition to Employee Ownership: a new era of shared success
In 2024 Gemini AMPM made a bold, future-focused decision to transition into an Employee Ownership Trust.
geminiampm.co.uk/gemini-ampms-transition-to-employee-ownership-a-new-era-of-shared-success/Every existing article keeps its URL: the renewed design re-skins the post template without breaking a single ranking link.
Reading up on
a real problem?
Tell us what’s behind the research and a named engineer comes back within 24 hours, not a call centre. Site surveys are free for commercial premises, no obligation.