Case Studies

Proof, not
promises.

A landmark City project, social-housing remediation delivered around residents, leisure-centre works completed without closing the doors: the kind of jobs that only go well when the same team owns the outcome.

Gas · Fire · Security Live · 2025-26

Peterborough Court, City of London

Landmark fire, gas suppression and security project delivered in a live City building.

Read the case study →
Passive Fire November 2025

Longfield Court, Whitstable

Loft compartmentation, fire stopping and added detection through an occupied assisted living scheme, praised in writing by the council.

Read the case study →
Fire · Dry Riser October 2025

Show theatre, Canary Wharf

A dry riser designed, routed and certified inside a nearly finished theatre, delivered around live rehearsals without a single remedial.

Read the case study →
Fire · Dampers July 2025

Splashpoint Leisure Centre

Corroded fire and smoke dampers replaced deep in a live leisure centre basement, with bespoke access built where conventional methods could not reach.

Read the case study →
Passive Fire Spring 2024

Chiswick Business Park, London

Fire door remediation and fire stopping through two buildings, four FIRAS certificates, and a programme that has since spread across the estate.

Read the case study →
Passive Fire February 2024

Highgate Wood School, Haringey

Twenty one fire stopping locations sealed through a live secondary school, main phase in the summer holidays, FIRAS certificated.

Read the case study →
Passive Fire October 2023

St Giles Crescent, Maldon

Roof space compartmentation across four occupied social housing blocks for a regulated housing provider, photo evidenced throughout.

Read the case study →
Fire · Evacuation Alert 2023

Helix Tower, Wembley

An evacuation alert system across 20 storeys and 600 student rooms, controlled only by the fire service, installed inside a full refit.

Read the case study →
Fire · Wireless November 2021

Unity Building, Liverpool

A Hyfire Taurus wireless fire system across 26 storeys and 161 apartments, installed in four weeks to stand down a costly waking watch.

Read the case study →
Fire · Alarm

Commercial office, City of London

A hybrid BS 5839-1 fire alarm across six occupied storeys, designed, installed and certified in four weeks without a single lost workday.

Read the case study →

A selection. Full case studies and client references available on request, including PQQ-ready evidence for tenders.

Talk to us

One call covers
the whole building.