A landmark City project, social-housing remediation delivered around residents, leisure-centre works completed without closing the doors: the kind of jobs that only go well when the same team owns the outcome.
Utilita Energy HQ, Eastleigh
The complete ductwork package behind a rooftop AHU replacement: strip-out, new installation and lagging across three roofs, with the head office working throughout.
Read the case study → Gas · Fire · Security Live · 2025-26Peterborough Court, City of London
Landmark fire, gas suppression and security project delivered in a live City building.
Read the case study → Passive Fire November 2025Longfield Court, Whitstable
Loft compartmentation, fire stopping and added detection through an occupied assisted living scheme, praised in writing by Canterbury City Council.
Read the case study → Fire · Dry Riser October 2025Show theatre, Canary Wharf
A dry riser designed, routed and certified inside a nearly finished theatre, delivered around live rehearsals without a single remedial.
Read the case study → Fire · Dampers July 2025Splashpoint Leisure Centre
Corroded fire and smoke dampers replaced deep in a live leisure centre basement, with bespoke access built where conventional methods could not reach.
Read the case study → Passive Fire Spring 2024Chiswick Business Park, London
Fire door remediation and fire stopping through two buildings, four FIRAS certificates, and a programme that has since spread across the estate.
Read the case study → Passive Fire February 2024Highgate Wood School, Haringey
Twenty one fire stopping locations sealed through a live secondary school, main phase in the summer holidays, FIRAS certificated.
Read the case study → Passive Fire October 2023St Giles Crescent, Maldon
Roof space compartmentation across four occupied social housing blocks for a regulated housing provider, photo evidenced throughout.
Read the case study → Fire · Evacuation Alert 2023Helix Tower, Wembley
An evacuation alert system across 20 storeys and 600 student rooms, controlled only by the fire service, installed inside a full refit.
Read the case study → Fire · Wireless November 2021Unity Building, Liverpool
A Hyfire Taurus wireless fire system across 26 storeys and 161 apartments, installed in four weeks to stand down a costly waking watch.
Read the case study → Fire · AlarmCommercial office, City of London
A hybrid BS 5839-1 fire alarm across six occupied storeys, designed, installed and certified in four weeks without a single lost workday.
Read the case study →A selection. Full case studies and client references available on request, including PQQ-ready evidence for tenders.