Case Studies

Proof, not
promises.

A landmark City project, social-housing remediation delivered around residents, leisure-centre works completed without closing the doors: the kind of jobs that only go well when the same team owns the outcome.

Ventilation · Ductwork Autumn 2026

Utilita Energy HQ, Eastleigh

The complete ductwork package behind a rooftop AHU replacement: strip-out, new installation and lagging across three roofs, with the head office working throughout.

Read the case study →
Gas · Fire · Security Live · 2025-26

Peterborough Court, City of London

Landmark fire, gas suppression and security project delivered in a live City building.

Read the case study →
Passive Fire November 2025

Longfield Court, Whitstable

Loft compartmentation, fire stopping and added detection through an occupied assisted living scheme, praised in writing by Canterbury City Council.

Read the case study →
Fire · Dry Riser October 2025

Show theatre, Canary Wharf

A dry riser designed, routed and certified inside a nearly finished theatre, delivered around live rehearsals without a single remedial.

Read the case study →
Fire · Dampers July 2025

Splashpoint Leisure Centre

Corroded fire and smoke dampers replaced deep in a live leisure centre basement, with bespoke access built where conventional methods could not reach.

Read the case study →
Passive Fire Spring 2024

Chiswick Business Park, London

Fire door remediation and fire stopping through two buildings, four FIRAS certificates, and a programme that has since spread across the estate.

Read the case study →
Passive Fire February 2024

Highgate Wood School, Haringey

Twenty one fire stopping locations sealed through a live secondary school, main phase in the summer holidays, FIRAS certificated.

Read the case study →
Passive Fire October 2023

St Giles Crescent, Maldon

Roof space compartmentation across four occupied social housing blocks for a regulated housing provider, photo evidenced throughout.

Read the case study →
Fire · Evacuation Alert 2023

Helix Tower, Wembley

An evacuation alert system across 20 storeys and 600 student rooms, controlled only by the fire service, installed inside a full refit.

Read the case study →
Fire · Wireless November 2021

Unity Building, Liverpool

A Hyfire Taurus wireless fire system across 26 storeys and 161 apartments, installed in four weeks to stand down a costly waking watch.

Read the case study →
Fire · Alarm

Commercial office, City of London

A hybrid BS 5839-1 fire alarm across six occupied storeys, designed, installed and certified in four weeks without a single lost workday.

Read the case study →

A selection. Full case studies and client references available on request, including PQQ-ready evidence for tenders.

Talk to us

One call covers
the whole building.