Proof, not
promises.
A landmark City project, social-housing remediation delivered around residents, leisure-centre works completed without closing the doors: the kind of jobs that only go well when the same team owns the outcome.
Peterborough Court, City of London
Landmark fire, gas suppression and security project delivered in a live City building.
Read the case study → Fire · Dry RiserShow theatre, Canary Wharf
A dry riser designed, routed and certified inside a nearly finished theatre, delivered around live rehearsals without a single remedial.
Read the case study → Fire · DampersSplashpoint Leisure Centre
Corroded fire and smoke dampers replaced deep in a live leisure centre basement, with bespoke access built where conventional methods could not reach.
Read the case study → Fire · AlarmCommercial office, City of London
A hybrid BS 5839-1 fire alarm across six occupied storeys, designed, installed and certified in four weeks without a single lost workday.
Read the case study → Fire · WirelessUnity Building, Liverpool
A Hyfire Taurus wireless fire system across 26 storeys and 161 apartments, installed in four weeks to stand down a costly waking watch.
Read the case study → Fire · High-RiseFour towers, Tower Hamlets
2,000 wireless devices across four high-rise towers and 497 apartments, ending a waking watch and saving more than £2.5m a year.
Read the case study → Passive FireLongfield Court, social housing
Full-time site foreman, resident-sensitive delivery, consistently positive tenant feedback.
Client references on request →A selection. Full case studies and client references available on request, including PQQ-ready evidence for tenders.